Poseidon Energy S.A. · Luxembourg · 561 MW Reserved · +1 GW Target by 2030
We design, invest, build and operate on-site power as a service. Where the grid cannot, and where primary and secured backup power is needed. From 2.5 MW pilots to +500 MW campuses. 561 MW already reserved to build from 2027. Target: +1 GW in Europe by 2030, representing over €5B in infrastructure CAPEX.
Performance dashboard
The next generation will inherit the infrastructure decisions we make today. Every megawatt we build either deepens dependency and carbon debt, or creates genuine independence and measurable sustainability.
Poseidon was founded to prove that critical infrastructure can power itself completely, cleanly, and permanently. Not through compromise. Through better engineering.
Your energy, Our future. Let’s build together today.
01 — Datacenters
For datacenter operators and infrastructure developers of any scale, from 2.5 MW edge deployments to 500 MW campuses. 561 MW already reserved across active projects.
02 — Defence
Critical infrastructure cannot depend on a grid it does not control. Poseidon’s island-mode SOFC microgrids deliver guaranteed power independence for defence campuses and NATO-aligned sovereign installations.
Poseidon’s power system combines modular solid oxide fuel cells (SOFC) with AI-optimised microgrid control, carbon capture at source, and full heat recovery. The result is a power plant that produces more than it emits, without combustion, without grid exposure, without compromise on availability.
Hydrogen is reformed on-site from natural gas or biomethane. Captured CO₂ is exported via pipeline, or liquefied for offtake by train, road, and waterway, for industrial offtake or recirculation into our green hydrogen and solar-gas projects.
Technology 01
Modular +60 kW solid oxide fuel cell units in a 25 MW, 20×33 m footprint. N+6 redundancy within each skid. Rapid deployment, hot-swap maintenance, zero combustion.
Technology 02
N+2 battery energy storage and microgrid architecture absorbs fluctuations, enables black-start, and eliminates diesel gensets entirely.
Technology 03
Up to 99% CO₂ capture from fuel cell exhaust, exported via pipeline, liquefaction, road, rail, and waterway. Recovered heat supplied to district networks. Total system efficiency 85–90%.
Technology 04
Digital backbone for reporting, smart grid optimisation, green gas contracting & internal operations, cyber-secure, cloud-native, fully integrated.
04 — Projects
Antwerp Region, Belgium — 10 ha
Europe’s first carbon-negative hyperscale AI datacenter campus. 500 MW destination with direct Elia grid access, 1 GW Fluxys gas connection, and full integration into Antwerp’s CO₂ corridor, district heating, and multi-modal CO₂ offtake. Backed by a consortium of EU industrial partners, not a single-company execution.
Phased rollout
Sardinia, Italy
A carbon-negative datacenter campus on the island of Sardinia, highly secured and protected under 300 m of solid rock in an underground decommissioned mine. Engagement open to invite infrastructure partners.
Belgium
First defence demonstration, sovereign, off-grid SOFC microgrid for a classified Belgian defence campus. Available for briefing under NDA. Further details available to qualified defence partners only.

Bjorn Van Haver
Founder & CEO
Bjorn@poseidonenergy.luMSc Engineering. Over 20 years in on-site clean power and over a decade building SOFC power systems across Europe. Founded Poseidon to prove that critical infrastructure can be fully independent and carbon-negative.

Olga Miglane
Partner & COO
Olga@poseidonenergy.luOperations and partner engagement lead. Drives project execution, strategic alliances, and the organisational infrastructure behind Poseidon’s EU-wide rollout.

Olaf Svanks
CFO
Olaf@poseidonenergy.luLeads financial strategy, structured project finance, and lender reporting across Poseidon’s SPV portfolio. Based in Luxembourg.

Matt Gray
Partner & Shareholder
hello@poseidonenergy.luVenture partner and shareholder via Newlands Ventures UK. Over 25 years in Energy, Infrastructure and Equity value creation. Brings strategic capital, client access and board-level counsel to Poseidon’s expansion.
Poseidon Energy S.A. is a Luxembourg-incorporated energy technology company. We develop, finance, build, and operate on-site SOFC power systems for critical infrastructure across Europe, from 2.5 MW defence pilots to 500 MW datacenter campuses.
Poseidon Energy S.A. integrates over 20 million combined operating hours of SOFC deployment experience, backed by a management team with 15+ years in on-site power and solid oxide fuel cell technology. Through a consortium of Tier 1 suppliers, strategic industrial partners, and institutional investors, we deliver the next generation of secure, dispatchable power infrastructure, with a carbon-negative pathway for Europe and beyond.
Whether you are a datacenter operator evaluating on-site power, a defence procurement office, or an investor, we would like to hear from you.